Wind farm gets permit for 277 turbines
Construction is required to begin within three years, and the developer has to provide preference for local hiring, including posting jobs with the local workforce center.
Construction is required to begin within three years, and the developer has to provide preference for local hiring, including posting jobs with the local workforce center.